top of page

PAST PROJECTS

Mulberry London Dock, Docklands
Client: Harrington Builders
Project Value: £150k
Demolition to create a large opening in an existing basement wall between neighbouring sites, complex waterproofing, concrete formwork and falsework and RC works.
Project Value: £150k
Demolition to create a large opening in an existing basement wall between neighbouring sites, complex waterproofing, concrete formwork and falsework and RC works.

Floral Street, Covent Garden
Principal Contractor: Curo Construction
Client: Curo Construction
Project Value: £750k
BWIC and intumescent spraying to existing concrete, supply and installation of fire curtains, rendering, RC works and soft strip demolition.
Client: Curo Construction
Project Value: £750k
BWIC and intumescent spraying to existing concrete, supply and installation of fire curtains, rendering, RC works and soft strip demolition.

Thames Road, Barking
Principal Contractor: McLaren Construction
Client: McLaren Construction
Project Value: £TBC
Firestopping works, fire curtain supply and installation, diamond drilling, RC works and all temporary works design and installations.
Client: McLaren Construction
Project Value: £TBC
Firestopping works, fire curtain supply and installation, diamond drilling, RC works and all temporary works design and installations.

Burston Gardens, St. Albans
Client: Erith
Project Value: £850k
Drainage works including deep drainage for a new residential development.
Project Value: £850k
Drainage works including deep drainage for a new residential development.

Access Self Storage
Client: Harmonix
Project Value: £125k
Concrete repairs to damaged columns with Sika Structural Repair Mortar to an exceptional finish and innovative light repairs to columns to remain exposed.
Project Value: £125k
Concrete repairs to damaged columns with Sika Structural Repair Mortar to an exceptional finish and innovative light repairs to columns to remain exposed.

Data Centre
Client: Lomas Steel
Project Value: £350k
Intumescent painting to over 200 tonnes of steelwork using a factory-based solution in a short timeframe of 12 weeks before delivery to site.
Project Value: £350k
Intumescent painting to over 200 tonnes of steelwork using a factory-based solution in a short timeframe of 12 weeks before delivery to site.

225 City Road, Shoreditch
Developer: Ghelamco
Client: Ghelamco
Project Value: £1.15m
Completing brickwork patterns internally and externally and masonry support, passive fire protection for all elements, screeding apartments, concrete making good and diamond drilling.
Client: Ghelamco
Project Value: £1.15m
Completing brickwork patterns internally and externally and masonry support, passive fire protection for all elements, screeding apartments, concrete making good and diamond drilling.

Sky Studios, Elstree
Principal Contractor: BAM Construction
Client: O'Keefe Group
Project Value: £850k
27,000m² of shuttering mesh and concrete placement with a brushed finish, 30,000 linear metres of saw cutting and Sika Pro Flex mastic to all expansion joints.
Client: O'Keefe Group
Project Value: £850k
27,000m² of shuttering mesh and concrete placement with a brushed finish, 30,000 linear metres of saw cutting and Sika Pro Flex mastic to all expansion joints.

Flaxyard, Peckham
Principal Contractor: Bouygues UK
Client: Bouygues UK
Project Value: £850k
Hard landscaping and installation of playground furniture, full passive protection package, exterior rendering, builders clean and all works recorded on our digital app.
Client: Bouygues UK
Project Value: £850k
Hard landscaping and installation of playground furniture, full passive protection package, exterior rendering, builders clean and all works recorded on our digital app.

Ritz Hotel, Piccadilly
Principal Contractor:
Sir Robert McAlpine
Client: Lomas Steel
Project Value: £550k
Intumescent painting to 20 tonnes of steelwork using a factory-based solution, then transported to site ready for installation.
Sir Robert McAlpine
Client: Lomas Steel
Project Value: £550k
Intumescent painting to 20 tonnes of steelwork using a factory-based solution, then transported to site ready for installation.

Park Street, Southwark
Principal Contractor: Kier Client: VKE Group
Project Value: £250k Concrete placement, diamond drilling and
concrete finishes.
Project Value: £250k Concrete placement, diamond drilling and
concrete finishes.

Cladding Digital Project
Client: Silver
Project Value: £65k Producing CAD of balcony plans ready for cladding remedial works, UAV Fire digital surveys for the golden thread process to ensure all emergency plans are compliant.
Project Value: £65k Producing CAD of balcony plans ready for cladding remedial works, UAV Fire digital surveys for the golden thread process to ensure all emergency plans are compliant.

Guildford Road, Woking
Principal Contractor: Galliford Try
Client: Gilbert-Ash
Project Value: £350k
Specialist concrete demolition, concrete cutting, bursting, Brokk demolition, screeding and specialist builders' works.
Client: Gilbert-Ash
Project Value: £350k
Specialist concrete demolition, concrete cutting, bursting, Brokk demolition, screeding and specialist builders' works.

HS2
Client: Byrne Brothers
Project Value: £750k
Concrete placement of the jump form, large concrete pours (slabs, walls and columns), diamond drilling, concrete sawing and labour supply.
Project Value: £750k
Concrete placement of the jump form, large concrete pours (slabs, walls and columns), diamond drilling, concrete sawing and labour supply.

Berners Street, Fitzrovia
Principal Contractor: McLaren Construction
Client: McLaren Construction
Project Value: £500k
Specialist builders' works, complex Passive Fire Protection for the whole building, diamond drilling and concrete sawing,
Client: McLaren Construction
Project Value: £500k
Specialist builders' works, complex Passive Fire Protection for the whole building, diamond drilling and concrete sawing,

Thames Road, Barking
Principal Contractor: McLaren Construction
Client: McLaren Construction
Project Value: £400k
Specialist builders' works, complex Passive Fire Protection for the whole building, diamond drilling and concrete sawing,
Client: McLaren Construction
Project Value: £400k
Specialist builders' works, complex Passive Fire Protection for the whole building, diamond drilling and concrete sawing,

Millbank, Westminster
Principal Contractor: St Edward Homes Ltd
Client: Foundation Developments
Project Value: £430k
Specialist demolition of two of the largest crane bases in London with concrete cutting, drill and bursting and Brokk demolition.
Client: Foundation Developments
Project Value: £430k
Specialist demolition of two of the largest crane bases in London with concrete cutting, drill and bursting and Brokk demolition.

Stadia 3, Wimbledon
Principal Contractor: Galliard Homes
Client: Modebest
Project Value: £150k
Slipform construction and concrete placement for RC frame slabs on the new residential development.
Client: Modebest
Project Value: £150k
Slipform construction and concrete placement for RC frame slabs on the new residential development.

W06 Wembley
Principal Contractor: McLaren
Client: McLaren
Project Value: £350k
Specialist concrete repairs to the slipform concrete core to achieve A-grade finishes.
Client: McLaren
Project Value: £350k
Specialist concrete repairs to the slipform concrete core to achieve A-grade finishes.

Barking Riverside Station
Principal Contractor: MSVF
Client: Morrisroe
Project Value: £250k
Concrete placement for groundworks, RC structures and bridge decks.
Client: Morrisroe
Project Value: £250k
Concrete placement for groundworks, RC structures and bridge decks.

Harbour Central, Canary Wharf
Principal Contractor: Galliard Homes
Client: Modebest
Project Value: £600k
Concrete placement for 5 different Slip Forms up to 35 storeys high and all associated concrete works.
Client: Modebest
Project Value: £600k
Concrete placement for 5 different Slip Forms up to 35 storeys high and all associated concrete works.

Edward Street Quarter, Brighton
Principal Contractor: McLaren
Client: O'Keefe
Project Value: £500k
Diamond drilling enabling works that expanded to concrete placement for the whole project with associated finishing works.
Client: O'Keefe
Project Value: £500k
Diamond drilling enabling works that expanded to concrete placement for the whole project with associated finishing works.

100 Bishopsgate
Principal Contractor: MULTIPLEX
Client: Byrne Brothers
Project Value: £2.5m
Concrete placement for a 40-storey Slip Form and associated concrete works.
Client: Byrne Brothers
Project Value: £2.5m
Concrete placement for a 40-storey Slip Form and associated concrete works.

Kent Wharf, Deptford
Principal Contractor:
Bellway Homes
Client: O’Keefe Construction
Project Value: £250k
Concrete placement of 3 blocks with slab pours, walls, columns and grouting of precast vertical panels.
Bellway Homes
Client: O’Keefe Construction
Project Value: £250k
Concrete placement of 3 blocks with slab pours, walls, columns and grouting of precast vertical panels.

Lambeth Library
Principal Contractor: Knight Harwood
Client: Modebest
Project Value: £200k
Concrete placement for the Slip Form and all associated concrete works.
Client: Modebest
Project Value: £200k
Concrete placement for the Slip Form and all associated concrete works.
We have worked in partnership with Principal Contractors and Developers, successfully completing many collaborative projects. We are well respected within the Construction Industry and take challenges in our stride.
TO DISCUSS YOUR NEXT PROJECT CONTACT US 01634 290096 OR USE OUR ENQUIRY FORM
bottom of page